References

Client Function Scope Highlights
Paswerk

2013/14

Advisory Board Advice on newbuild projects Training vessel UNION
Heerema Offshore Services

2013

Technical advisor Concept review New semisubmersible crane vessel
Heerema Offshore Services

2010/12

Project manager Design requirements,
Concept and Basic design,
FMEA’s and special studies incl. model tests.
Contract specifications
Special purpose ship Reel and J-lay Deepwater lowering Mastcrane 4000 t Anti-heeling ballast system

DCV AEGIR

Heerema Offshore Services

2007/8/9

Project manager Design requirements
Basic Design
Safety studies
Model tests
Technical specifications
Semi-submersible offshore construction vessel
  • NBV design
  • Optimum hull shape
  • stability, motions, survivability, speed
  • braceless hull construction
  • ultimate strength and fatigue
  • J-Lay and deepwater lowering system
  • 2 x 5500 t lifting capacity
  • ING Bank NV
    Atradius DSB

    SHL Shipping Ltd

    2007/8/9

    Principal consultant Technical review and progress monitoring of monohull crane vessel
    OLEG STRASHNOV
    Launch from IHC Merwede Krimpen slipway 22 Aug 09
    Client

    2006/7

    Principal consultant Market search Identification of offshore equipment
    Wagenborg Kazakhstan

    2006

    Engineering manager Modification of LQB Shapagat
    Integration of LQB Karlygash with ice breaking escape vessels.
    Living Quarter Barge SHAPAGAT
    Amerada Hess

    2006

    Expert naval architect Independent FPSO review. Review of on site Repair Program of FPSO Sendje Ceiba
    Cuulong Joint Operating Company, Vietnam

    2005

    Principal consultant Life Time Extension Program tanker conversion
    Turret mooring system
    Tandem mooring system
    Preparation Bid Specification Tanker based FSO
    Genius Vos

    2005

    Expert naval architect Motion analysis of offshore transhipment between a supply vessel and a jack-up Mono pile and tower installation
    Wagenborg Kazakhstan

    2005

    Principal consultant Tender assistance Marine services in the Caspian
    ING Bank
    SBM Offshore

    2005

    Principal consultant Technical review of SANHA LPG FPSO
    Heerema Marine Contractors

    2005

    Study contract Failure mode effect and criticality analysis FMECA Pipe Elevator and J-Lay Tower DCV Balder
    RABO Participaties

    2004

    Principal consultant Operational due diligence management buy-out
    Fabricom Oil & Gas

    2004/5

    Study contract Offshore Access System OAS
    Motions and Load analysis
    Finite element strength analysis
    Vessel selection
    OAS Prototype on Smit Kamara
    ING Bank
    Modec

    2004

    Principal consultant Technical review of MODEC FPSO Baobab for deepwater operations offshore Cote d'Ivoir. Turret inspection by consultant
    ING Bank
    IHC Caland

    2004

    Principal consultant Technical review of SBM's FPSO Serpentina for deepwater operations in West Africa
    IHC Holland Dredgers

    2004

    Principal consultant Technical and budgetary review of a Large Self Propelled Cutter Dredger d’Artagnan for DEME
    Repsol Exploration SA

    2003/4

    Principal Consultant Prestige cargo neutralisation project
    Expert advice to project director
    Company representative in on board Odin and Enterprise vessel
    ING Bank
    IHC Caland

    2003

    Principal consultant Technical review of SBM's FPSO Marlim Sul for deepwater operations in Brazil
    ING Bank
    IHC Caland

    2003

    Principal Consultant Technical review of SBM's floating production storage and offloading unit, FPSO Xikomba for deepwater operations in West Africa
    Fortis Bank
    IHC Caland

    2003

    Principal Consultant Technical review of SBM-Imodco's floating production, storage and offloading unit, FPSO Kuito, phase 2A Installation of extra modules on site.
    De Voogt Naval Architect

    2002/3

    Project Engineering Manager Preparation of Design and Engineering guidelines for a quality system: "MANUAL DE VOOGT". CAD and Drawing standards.
    Review of the design and engineering process of large luxury yachts
    Interface with client, class, vendors and construction yards.
    Preparation of example drawings per discipline; "what you see is what you get".
    Project quality control procedures.
    NIB Bank
    Vanguard SPC

    2002

    Principal Consultant Technical review disconnectable turret system FPSO Four Vanguard. Identification of project risks.
    In depth review of technical reports and drawings of the turret structure with ship interface.
    ING Bank (IHC Caland)

    2001

    Principal Consultant Technical review of SBM’s floating production, storage and offloading unit, FPSO Falcon.
    De Voogt Naval Architects

    2001

    Principal Consultant Wave bending moment evaluation of a high speed motor yacht. Effects of slamming and whipping on hull girder loads. Outline description of an overload prediction system.
    Fortis Bank (IHC Caland)

    2001

    Principal Consultant Technical review of SBM's floating production, storage and offloading unit, FPSO Brasil. Comprehensive review of technical project, comprising design and construction of hull, topside, offloading, turret and anchoring systems
    Vessel inspection at the construction site.
    Heerema Marine Contractors

    2001

    Project manager, Design and Interface DCV Balder:
    - Hull structure reinforcement and life time extension
    - Tower support structure
    - Equipment foundations
    - Fly-jib
    - Interface control
    - Weight and stability control
    - Class and statutory approvals
    - Design safety case
    - Editing operations manual
    ING Bank (IHC Caland)

    2000

    Principal Consultant Technical review of SBM's FPSO Espadarte for deepwater operations Comprehensive review of technical project, comprising design and construction of hull, topside, offloading, turret and anchoring systems
    Feadship

    2000

    Principal Consultant Quality assessment of Feadship yachts Interviews with captains and chief engineers to assess client satisfaction on yacht and subsystems design. Inquiry via internet. Presented at annual Feadship captains symposium.
    De Voogt Naval Architects

    2000

    Principal Consultant Development of a new generation luxury mega yachts. Concept development of diesel electric power generation, with pod propulsion and DP tracking system.
    Guangzhou Shipyard International

    2000

    Co-ordinator Failure mode and effect analysis FMEA on the DP Heavy lifting vessels for CosCo
    Allseas

    2000

    Subcontracted to Lagomar Okeanos Marketing study Pipelaying vessels Deepwater prospects of DP pipelaying vessels with S-lay systems.
    Huisman-Itrec

    2000

    Principal consultant Failure mode and effect analysis FMEA on the pipe laying equipment of DP vessel Deep Blue
    Pipe laying tower
    Vroon Meijssen Telco, Joint venture

    2000

    Chief naval architect Development of cable laying beach craft Special craft applicable in tidal estuaries.
    Noordhoek

    2000

    Sub-contr. to GHC Preparation installation manual Communication buoy.
    Workships

    2000

    Project manager Design and Interface Design of mobile catamaran dock for vessel repair and heavy transportation New market potential as "early production" repair platform.
    De Voogt Naval Architects

    1999

    Principal Consultant Editing of contract specification luxury motor yacht. Barbara Jean
    Mansall Offshore QSC

    1999

    Principal Consultant Jointly with PML-UK Review of environmental design criteria for self elevating maintenance platform Leen. Guidelines for classification of revised operational conditions.
    De Vries Scheepsbouw

    1999

    Principal Consultant Preparation of a standard contract specification for luxury motor yacht 50+ m Lady Marina